A guided route from requirement to production

Every project begins with a clear definition of function, interfaces, materials, responsibilities, and deliverables. The process is scaled to the work: a build-to-print part may move quickly, while a new product or assembly may require engineering, prototype, and approval stages.

From requirement to production

Lotus Power Scroll Process
01

Requirement Review

Review the product function, drawings, specifications, samples, quality, timeline, standards, interfaces, and current bottleneck.

02

Scope and Responsibility

Review the product function, drawings, specifications, samples, quantity, timeline, workload, interfaces, and current bottleneck.

03

Engineering and DFM

Review manufacturability, tolerances, materials, weld and braze processes, assembly sequences, critical dimensions, material selection, and inspection approach.

04

Quotation and Release

Issue a quote with assumptions, quantities, lead time, technical clarifications, deliverables, and change-control notes. Work begins after commercial and technical release.

05

Prototype or First Article

Produce a sample or first article when required. Review fit, function, manufacturing observations, inspection results, and any design updates.

06

Approval and Production

Freeze the approved revision, prepare production documentation, manufacture the parts or subassemblies, and complete the agreed inspection and packaging steps.

07

Repeat Supply

Use controlled drawings, revision history, inspection criteria, and production methods to support repeat orders and future variants.

Start with the Files

You do not need a perfect package to begin. Send the best available drawings, specifications, photos, samples, or product description.
Start with your files